Company News Industry News
HOME > News > Company News

Company News
企业动态

Add Date:2021/9/2   Clicks:

Foshan Huijiang Concrete Co., LTD. Wharf construction project information disclosure

In order to protect the public’s right to know, participate, express, and supervise environmental protection, in accordance with the "Measures for Public Participation in Environmental Impact Assessment" (Order No. 4 of the Ministry of Ecology and Environment), the following information is now disclosed to solicit information related to the environmental impact of the construction project opinion.

1. Project overview
Construction Project Name: Wharf Construction Project of Foshan Huijiang Concrete Co., Ltd.
Construction unit: Foshan Huijiang Concrete Co., Ltd.
Construction project location: No. 1 berth of Huijiang Wharf, Sanshan Port District, Foshan Port
Construction content: Foshan Huijiang Concrete Co., Ltd. Wharf is located at No. 1 berth of Huijiang Wharf, Sanshan Port District, Foshan Port. It is mainly engaged in general bulk cargo loading and unloading. The loading and unloading cargoes are sand, stone and cement. This project has a 1,000-ton capacity Bulk cargo berth, the length of the berth is 78m, mainly for the production and supply of sand, stone and cement for Foshan Huijiang Concrete Co., Ltd.

2. Name and contact information of the construction unit
Construction unit: Foshan Huijiang Concrete Co., Ltd. Contact: Feng Hansheng
Contact number: 15820693222 Zip code: 528200 E-mail: 386345529@qq.com
Mailing address: Pingsheng Industrial Zone, Pingzhou, Nanhai District, Foshan City

3. Name of the organization that prepared the environmental impact report
Foshan Nanhai Environmental Science Research Institute Co., Ltd.

4. The web link of the public comment form:
Link: https://pan.baidu.com/s/1DMt-NBlwRnydzFbApPaOqg Extraction code: 3jua

5. Ways and means of submitting the public comment form
If the public has suggestions and opinions related to the environmental impact and environmental protection measures of this project, please download and fill in the "Construction Project Environmental Impact Assessment Public Opinion Form" from the above network link, and submit the completed form on site, by letter or email, etc. The method is submitted to the construction unit.

6. The start and end time for public comments
Starting from the date of this announcement, the public can submit opinions related to environmental impact assessment to the construction unit during the preparation of the draft environmental impact report.

Foshan Huijiang Concrete Co., Ltd.
September 2 2021